Home / FAQs

EICRs & landlords

EICR, landlord and commercial electrical testing FAQs

These landlord EICR FAQs explain inspection intervals, reports and booking details. Plan access and power interruptions for an Enfield rental property, home or business.

EICRs & landlords questions

How often do landlords need an EICR, and what are the penalties?

For rented homes that fall under England’s electrical safety regulations, arrange inspection and testing by a qualified person at least every five years. However, use a shorter interval if the report requires it. If the report calls for repairs or further investigation, arrange the work within 28 days or any shorter deadline it sets. Deal with immediate dangers straight away. Councils can impose financial penalties of up to £40,000 for specified breaches. Check the current GOV.UK guidance for the rules and exceptions that apply to your tenancy.

When must a landlord give tenants a copy of the EICR?

For tenancies covered by the rules in England, give existing tenants a copy within 28 days of the inspection and new tenants a copy before they move in. If a prospective tenant asks in writing, supply a copy within 28 days. If the local housing authority asks in writing, supply it within seven days. Read the GOV.UK guidance.

Do I need a new EICR every time a tenant changes?

For tenancies starting on or after 30 November 2026, an inspection carried out within the previous five years can satisfy the pre-tenancy inspection requirement if it meets the conditions in the amended regulations. The report must still be current. Check its next inspection date and whether any remedial work listed in the report is outstanding. Read the 2026 amendment.

How long does an EICR take, and how much does it cost?

The time and price depend on your property, the number of circuits, access and the inspection scope. First, send the property type, use, postcode and any previous report. Testing also involves interruptions to power, so tell us about tenants, business hours and equipment that needs special planning before switch-off. Before booking, agree when you will receive the report and whether the quote covers any repairs.

Do you carry out commercial electrical testing and installations?

You can enquire about electrical inspection, testing and installation work for business premises. First, describe your business, the installation, opening hours and any limits on access or switching off equipment. We can then confirm the competence and inspection scope your project needs, including any specialist work. Ask the quote to set out the report, certificates and likely disruption.

Will the power need to be switched off during an EICR?

Inspection and testing normally require planned interruptions to the supply. Discuss likely disruption before the visit, including essential equipment, business operations and access to each area. Tell the electrician about equipment that cannot simply be switched off so suitable arrangements can be agreed. Do not assume all testing can take place with the power left on.

Are remedial repairs included in an EICR quotation?

An EICR is an inspection and report; repairs are not automatically included. Check the quotation for the agreed scope. If the report identifies issues, ask for a clear explanation and a separate scope and price for investigation or remedial work where needed. Follow the inspector’s advice about any immediate danger.

Have a job in mind?

Request a quote for planned work, send job details on WhatsApp, or contact us to check attendance for an urgent fault.

Scroll to Top