HMO electrical inspections and fire alarm requirements
Start with the property licence, fire risk assessment and existing inspection records.
HMO electrical inspections and fire alarm requirements Read More »
Start with the property licence, fire risk assessment and existing inspection records.
HMO electrical inspections and fire alarm requirements Read More »
Gather the lighting logbook, layout drawings and previous defect reports.
Emergency lighting testing for business premises Read More »
Compare electric underfloor heating mats, cable and foil. Calculate running costs, plan floor height and agree testing before the finish goes down.
Electric underfloor heating: costs, floor height and installation Read More »
Decide whether each light is for steps, a doorway, a seating area or security.
Choosing outdoor lighting for a UK garden Read More »
Start with the worktop and hob positions.
Choosing downlights for a kitchen Read More »
Mark each proposed socket on a room plan and say what it will supply.
What affects the price of extra plug sockets? Read More »
The number of fittings is only one part of the quote.
What does it cost to install downlights? Read More »
Agree a room-by-room programme before deciding.
Can you stay at home during a rewire? Read More »
Read the observation, its location and the recommended action together.
Understanding C1, C2 and C3 observations on an EICR Read More »
Compare electric and dual-fuel towel rails, calculate running costs from your tariff and plan safe bathroom installation, controls and hanging space.
Planning an electric towel rail Read More »