Meter tails — who needs to be involved?
For a planned board move or supply upgrade, show the meter and consumer unit positions from a safe distance.
Meter tails — who needs to be involved? Read More »
Practical CCTV and intruder alarm planning guides.
For a planned board move or supply upgrade, show the meter and consumer unit positions from a safe distance.
Meter tails — who needs to be involved? Read More »
Ask at quotation stage how the proposed work will be certified and whether building control notification applies.
Part P and electrical work in England — planning the paperwork Read More »
Choose CCTV around the views you need, cable routes, night lighting, storage and privacy before selecting a camera model.
Planning home CCTV: seven things to decide first Read More »
Compare CCTV and intruder alarms by what you need to see, detect and respond to before choosing home security.
Do I need CCTV, an intruder alarm, or both? Read More »
Compare cable routes, batteries, daily use and maintenance before choosing a wired, wireless or hybrid intruder alarm.
Wired or wireless intruder alarm: what should you consider? Read More »
Read the observation, its location and the recommended action together.
Understanding C1, C2 and C3 observations on an EICR Read More »
If an inspection flags earthing or bonding, ask which connection was inspected, what was measured and what action is recommended.
Earthing and bonding — questions to ask your electrician Read More »
Record whether the shower has lost power, water flow or heat, and whether other equipment is affected.
Electric shower stopped working? Read More »
Check what is connected and inspect the lead for visible damage.
Extension lead safety at home Read More »