EICR Cost for Landlords: Price Factors, Legal Rules & How to Compare Quotes

Landlord EICR quotes vary widely because an Electrical Installation Condition Report is priced by circuit count, consumer unit layout and testing depth—not just bedroom count. For landlords in Enfield, North London, Hertfordshire and Essex, comparing quotes properly means checking what is actually included in the inspection, how fast the report is issued, and how remedial repairs or further investigation are priced if faults are found.

1. What Actually Drives Landlord EICR Costs?

While many quotes are initially grouped by property size (studio/1-bed flat, 2–3 bedroom house, or larger HMO), two properties with the same number of bedrooms can take very different times to inspect and test safely. When pricing an EICR, a qualified electrician looks at:

  • Number of consumer units (fuse boards): Flats with a separate off-peak Economy 7 board, or houses with an outbuilding, garage or loft conversion sub-board, require additional testing schedules.
  • Total number of circuits: A modern flat with 6 circuits takes considerably less time to test dead and live than a larger family home or HMO with 14+ circuits.
  • Property age and wiring condition: Older installations without circuit charts require extra tracing and labelling before accurate BS 7671 test readings can be recorded.
  • Access and occupancy: Occupied rentals require safe coordination with tenants so circuits can be isolated briefly for dead testing (continuity, insulation resistance and polarity) without disrupting home-working or appliances unexpectedly.

2. How to Compare Landlord EICR Quotes Fairly

A headline price that looks unusually cheap often excludes extra circuits, skips sampling rules without agreement, or inflates remedial repair rates once the report is issued. Before booking, ask every contractor the same four questions:

What to Check What a Transparent Quote Covers Red Flag to Watch Out For
Circuit & Board Allowance States how many consumer units and circuits are included in the base fee, plus the per-circuit rate above that limit. No circuit count mentioned, leading to surprise add-ons on site.
Inspection & Testing Scope Full visual inspection plus dead and live testing of protective devices, earthing, bonding and circuits to BS 7671. Rushed 20-minute “visual only” checks that miss hidden faults.
Report Turnaround Clear timescale (typically within 24–48 hours) for delivering the signed digital PDF report ready for tenants or letting agents. Vague delivery dates when you have a tenancy check-in deadline.
Further Investigation (FI) & Remedials Explains how FI items are hourly-rated or quoted, with itemised remedial pricing and no obligation to use the same firm. Lump-sum remedial quotes with no breakdown by circuit or fault code.

3. Understanding EICR Observation Codes (C1, C2, C3 & FI)

Your EICR will be graded either Satisfactory or Unsatisfactory. Any observations found during the inspection are classified using four standard BS 7671 codes:

  • C1 (Danger present): Risk of injury exists immediately—for example, exposed live parts or missing enclosures. Requires immediate make-safe action before the engineer leaves site.
  • C2 (Potentially dangerous): Urgent remedial action required—such as absent earthing/bonding, damaged accessories, or missing 30mA RCD protection where required for safety.
  • FI (Further investigation required without delay): An anomaly was detected during testing that could not be traced within the standard inspection time and needs targeted fault-finding.
  • C3 (Improvement recommended): Does not meet the latest edition of the wiring regulations, but is not unsafe. A report with only C3 codes is still graded Satisfactory.

Any C1, C2 or FI code results in an Unsatisfactory EICR until the underlying fault is resolved and confirmed safe in writing.

4. Landlord EICR Legal Rules & Deadlines in England

Under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, private landlords must meet strict statutory deadlines:

  • Every 5 years (maximum): Have the fixed electrical installation inspected and tested to BS 7671 by a qualified and competent person at intervals of no more than 5 years (or sooner if specified on the previous report).
  • Before a new tenant moves in: Supply a copy of the current satisfactory report to any new tenant before they occupy the property, and to any prospective tenant within 28 days of a written request.
  • Existing tenants & local council: Give existing tenants a copy within 28 days of the inspection, and supply a copy to the local housing authority within 7 days if requested.
  • 28-day remedial deadline: If your EICR is Unsatisfactory (C1, C2 or FI), you must complete all required remedial or investigative work within 28 days (or sooner if stated on the report), obtain written confirmation from a qualified person, and send both documents to the tenant and local council within 28 days of completion.

Local authorities can issue remedial notices and civil penalties (up to £40,000 for breaches from May 2026) where landlords fail to comply or miss remedial deadlines.

5. What to Send When Requesting an EICR Quote

To get an accurate, like-for-like EICR quote without guesswork, send these four details when you get in touch:

  1. Property type and postcode: e.g. 2-bed purpose-built flat in EN1, 3-bed terraced house in N21, or licensed HMO.
  2. Number of consumer units and circuits (if known): A quick photo of the open fuse board showing the switches/MCBs is usually enough.
  3. Occupancy and key access: Whether the property is vacant, tenanted, or managed via a letting agent.
  4. Target deadline: Whether you are renewing ahead of your 5-year expiry date or working to a tenancy start date.

Need full inspection and testing details? Read more on our electrical services and EICR inspections page.

Frequently Asked Questions

How long does a landlord EICR take?

A typical 1- to 2-bedroom flat with a single modern consumer unit usually takes around 1.5 to 2.5 hours, while a 3- to 4-bedroom house or property with multiple boards can take 3 to 4 hours depending on circuit count and access.

Do I need a brand-new EICR every time a tenant changes?

No—provided your existing EICR is still within its 5-year validity period (and has not been shortened by the inspector) and no uncertified alterations or damage have occurred, you simply give the new tenant a copy of the valid report before they move in.

Do I have to use the same electrician who did the EICR for remedial work?

No. You are free to use any qualified electrician to complete C1, C2 or FI remedial works. Once completed, they issue written confirmation (such as an Electrical Installation Certificate or Minor Electrical Installation Works Certificate) which sits alongside your original EICR.

Send a photo of your consumer unit and your property postcode on WhatsApp or request a quote online. Intela Electricals provides clear EICR pricing, prompt digital reports and itemised remedial quotes.

 

Scroll to Top