# Buying a house in London — electrical checklist

- Link: https://intelaelectricals.co.uk/electrical-checklist-buying-a-house-london/
- Published: 2026-11-22T12:36:20+00:00
- Author: Intela Electricals

[← All articles](https://intelaelectricals.co.uk/blog/)

# Buying a house in London — electrical checklist

Before exchanging contracts on a London home, match three things: what the seller
says was done, what the electrical paperwork actually covers and what you plan to
change after moving in. Start with the latest electrical installation condition 
report, any certificates for alterations and the dates of extensions or conversions.
Where the evidence leaves an important question unanswered, arrange an inspection
with the seller’s permission while the answer can still influence your decision.

By Intela Electricals · 22 November 2026 · [EICR and certificates](https://intelaelectricals.co.uk/category/eicr-and-certificates/)

![UK domestic consumer unit with circuit breakers and a residual current device](
https://i0.wp.com/intelaelectricals.co.uk/wp-content/uploads/2026/11/Domestic_Consumer_Unit.
jpg?resize=800%2C401&ssl=1)

[Domestic consumer unit, Pfnicholls](https://commons.wikimedia.org/wiki/File:Domestic_Consumer_Unit.JPG),
[CC BY-SA 4.0](https://creativecommons.org/licenses/by-sa/4.0/).

A house described as “recently rewired” may have a certificate covering only a kitchen
extension. Equally, missing paperwork does not establish that the whole house needs
rewiring. Ask what work was carried out, which circuits it involved and when. A 
precise answer can save you from budgeting for a major job on the strength of an
estate agent’s phrase or assuming an old circuit has been renewed.

## On the viewing, follow the rooms you expect to use

Walk through an ordinary weekday in the property. Where would you work, prepare 
food, charge a laptop or plug in a vacuum? Count accessible outlets where the furniture
will actually stand. Four sockets behind a proposed wardrobe will do little for 
a desk on the opposite wall. Write down improvements separately from visible damage
so convenience costs and potential safety concerns do not become one alarming estimate.

Ask where the consumer unit and electricity meter are. In a converted house the 
two may be in different places, and a locked intake cupboard may be managed by someone
outside the flat. With permission, take a wide photograph showing access and another
showing labels visible from the front. Leave protective covers, switches and test
buttons alone. This is somebody else’s occupied installation.

Look for obvious damage from a normal standing position. Note a cracked accessory
beside a door, a loose-looking faceplate or staining below a previous leak. Describe
exactly what you saw and where. Avoid moving appliances, touching suspect equipment
or lifting flooring. A photograph can help an inspector find the point later. It
cannot establish the condition of the wiring behind it.

## Put the paperwork in date order

Make a simple list with one line per document. Record the property address, date,
document title, description of work and any areas excluded. Ask for complete copies
with schedules rather than just the front page. A certificate with the right postcode
but the wrong flat number merits a query. Converted houses sometimes have both a
street number and a flat description that changed over time.

An electrical installation certificate describes the installation work identified
on it. A minor works certificate may cover a smaller alteration. An EICR records
the condition of an existing installation within the stated extent and limitations
at the inspection date. Read the description before deciding which question a document
answers. A certificate for adding sockets to a bedroom does not describe the history
of the bathroom circuit.

For notifiable work in England, ask about the Building Regulations paperwork as 
well as the electrical certificate. A new circuit is one example where notification
is relevant. Your conveyancer can raise enquiries about missing records and advise
on the transaction. An electrician can explain the technical scope and assess the
installation. [Approved Document P sets out the guidance for dwellings in England](https://www.gov.uk/government/publications/electrical-safety-approved-document-p).

## Compare the report with the property standing today

Imagine an EICR dated February, followed by a kitchen extension completed in October.
The report may describe the original house accurately while saying nothing about
the later circuits. Ask for the installation paperwork for the extension and check
how the new area is supplied. If the seller also mentions a garage conversion, add
it to the timeline as a separate item.

Now reverse the dates. An inspection after the conversion might include the new 
kitchen, yet still exclude the detached garage because nobody could find its key.
Find the recorded extent and limitations. Ask whether the inspector accessed the
relevant board, rather than relying on the newer date alone. The report’s conclusion
needs to be read alongside the parts of the installation it actually describes.

Where a report recommends remedial work, ask for evidence linking the repair to 
the observation. “Electrical works complete” on an invoice is difficult to match
to a particular circuit. A description identifying the observation, location and
work carried out helps the next electrician understand what changed. If the evidence
is unclear, mark that item unresolved and ask for a technical review before treating
it as closed.

## Decide whether to commission an independent EICR

Read the scope of your building survey. RICS says its Level One survey includes 
no tests of building services. A comment that the consumer unit looks modern is 
a visual observation. It cannot establish the results of electrical measurements.
Electrical Safety First advises buyers to check for a recent EICR and arrange one
where necessary. See the [RICS survey scope](https://www.rics.org/profession-standards/rics-standards-and-guidance/sector-standards/building-surveying-standards/home-surveys/scope-of-inspection-home-survey-level-one)
and [Electrical Safety First’s advice for buyers](https://www.electricalsafetyfirst.org.uk/safety-advice/home-and-people/home-buyers).

Tell the inspector why you are commissioning the report and when you need the findings.
Supply the floor plan, known alterations, earlier reports and a short list of concerns.
Agree the extent, fee, access and how findings will be communicated. A quick accompanied
viewing with verbal comments and a full condition report are different appointments.
Establish which one the seller is authorising.

Ask the agent to arrange access with the actual occupier. The electrician may need
planned interruptions and access to rooms normally kept locked. Identify tenants
working from home, powered equipment that must remain available and any separate
garage or loft board. A key to the front door may be insufficient. If the seller
limits access, ask the inspector how that affects the conclusions you can reasonably
draw.

## Allow for London flats and shared buildings

Trace the distinction between your prospective flat and communal services. A hall
light outside your front door, a communal entry system and an intake cupboard under
the stairs may fall under different management arrangements. Ask the managing agent
who controls access and which records relate to the common parts. A report for the
shared hallway cannot answer a question about sockets inside the flat.

For a basement flat with a meter upstairs, establish how an electrician can gain
authorised access after completion. Write down the managing agent’s contact, cupboard
reference and arrangements for appointments. Check whether the meter number on the
seller’s documentation corresponds to the flat being sold. If several meters are
close together, leave identification of electrical connections to the relevant professionals.

If refurbishment is planned in a leasehold flat, discuss possible permissions with
your conveyancer and managing agent. Ask about contractor hours, service routes,
parking and protection of communal areas. A route drawn through a shared corridor
may be unavailable. A quotation based on that assumed route could substantially 
understate the work needed to keep alterations within the area you control.

## Cost your plans separately from existing defects

A satisfactory condition report and a convenient home are different outcomes. You
might still want more bedroom sockets, better kitchen lighting or a supply for a
garden office. Prepare a second list headed proposed improvements. Put each item
beside a room, intended use and approximate position. This gives an electrician 
something tangible to price without implying that every improvement is a repair.

![UK double wall socket with a plug in the left outlet](https://i0.wp.com/intelaelectricals.
co.uk/wp-content/uploads/2026/11/UK_BS1363_double_wall_socket.jpg?resize=1200%2C900&
ssl=1)

[UK double wall socket, Thryduulf](https://commons.wikimedia.org/wiki/File:UK_BS1363_double_wall_socket.jpg),
[CC BY 3.0](https://creativecommons.org/licenses/by/3.0/).

For a planned electric shower, provide the intended model or power requirement if
known. For a home office, distinguish ordinary desk equipment from heating, workshop
tools or an outbuilding supply. Ask what needs checking before a price can be fixed.
Spare spaces visible on a consumer unit do not establish that the installation can
accommodate every new load on your list.

Coordinate work with decorating and flooring. If an inspection identifies a repair
under a hallway floor, ask about access before committing to new fitted carpet. 
For improvements, compare cable routes and the finish each would leave. Keep the
electrician’s price separate from plastering, joinery and painting where quoted 
by different trades. Our [guide to extra socket costs](https://intelaelectricals.co.uk/cost-to-add-extra-plug-sockets/)
explains how access affects a small alteration.

## Turn the findings into purchasing decisions

Use three headings for your final note: matters requiring prompt attention, items
needing more evidence, and improvements you can schedule after moving. Ask the inspector
to explain the priority and implications of individual observations. Then obtain
scoped prices where possible. A single round figure for “all electrics” makes it
difficult to judge which expenditure is urgent and which reflects your own preferred
specification.

Give the written findings to your conveyancer before deciding how to proceed. If
the seller proposes completing work before exchange, agree what evidence you need
and who will review it. If you expect to arrange it after completion, confirm access
and realistic dates with contractors. Whether to negotiate, proceed or seek further
advice is a purchasing decision informed by the technical findings.

## A worked example for a second viewing

Suppose you are buying a three-bedroom terrace with a converted loft, a garden studio
and a recently fitted kitchen. The seller provides a certificate for the kitchen
and says the studio was already there when they moved in. On your second visit, 
the estate agent has keys for the house and garden gate, but the studio door is 
locked. The sensible conclusion is that the studio supply remains an open question.

Send the kitchen certificate to the inspector with a note identifying which part
of the property it concerns. Ask the agent to arrange a key for the studio and permission
to access its electrical equipment. Send the loft conversion date to your conveyancer
and ask which records have been requested. Those three actions direct each question
to the person able to answer it.

If time only allows one visit, tell the inspector which uncertainty affects your
offer most. For example, you may need the studio for work immediately but intend
to refit the kitchen next year. Ask what can realistically be covered at the appointment
and what might require a separate design survey. Keep the inspection findings with
the purchase file and the design estimate with your refurbishment budget. Record
any outstanding access restriction alongside the price so everybody understands 
exactly which part of the studio still needs further investigation.

## Frequently asked questions

### What electrical paperwork should I request for a loft conversion?

Ask for the electrical installation documents for the conversion and any relevant
Building Regulations records. Compare the completion date with the most recent EICR.
A report produced beforehand cannot describe later alterations. Check whether the
loft has its own board and whether a later inspection expressly included it. Pass
gaps to the inspector and conveyancer separately.

### Does a new consumer unit mean the house was rewired?

A consumer unit can be replaced while existing circuits remain in place. Read the
work description and circuit schedule before drawing conclusions about cables in
the walls. If the seller describes a complete rewire, ask which floors, extensions
and outbuildings were included. Clarify any circuits that the certificate describes
as existing or retained.

### Can I rely on a previous landlord’s electrical report?

It may be useful evidence for the property at the inspection date. Review the address,
extent, limitations, outcome and any subsequent alterations. Ask for evidence of
remedial work where relevant. If the report does not cover the space you are buying
or leaves important findings unresolved, discuss an independent assessment with 
the electrician.

### What if the seller will not allow testing before exchange?

Ask whether the difficulty is timing, access or interruption to the occupied property.
A specific appointment and a clear scope may resolve the issue. If permission remains
unavailable, ask your conveyancer how to handle that uncertainty. Keep uninspected
items identified in your budget instead of treating a visual viewing as equivalent
to electrical testing.

### How do I book electrical checks for an Enfield purchase?

Send the address, property type, floor plan, exchange timetable and contact details
for arranging authorised access. Include the dates of known extensions, previous
reports and the questions affecting your decision. Use our [EICR inspection service](https://intelaelectricals.co.uk/eicr/)
or [contact Intela Electricals](https://intelaelectricals.co.uk/contact/) to agree
the inspection scope before booking.

**On this page**[On the viewing, follow the rooms you expect to use](https://intelaelectricals.co.uk/electrical-checklist-buying-a-house-london/#guide-section-1)
[Put the paperwork in date order](https://intelaelectricals.co.uk/electrical-checklist-buying-a-house-london/#guide-section-2)
[Compare the report with the property standing today](https://intelaelectricals.co.uk/electrical-checklist-buying-a-house-london/#guide-section-3)
[Decide whether to commission an independent EICR](https://intelaelectricals.co.uk/electrical-checklist-buying-a-house-london/#guide-section-4)
[Allow for London flats and shared buildings](https://intelaelectricals.co.uk/electrical-checklist-buying-a-house-london/#guide-section-5)
[Cost your plans separately from existing defects](https://intelaelectricals.co.uk/electrical-checklist-buying-a-house-london/#guide-section-6)
[Turn the findings into purchasing decisions](https://intelaelectricals.co.uk/electrical-checklist-buying-a-house-london/#guide-section-7)
[A worked example for a second viewing](https://intelaelectricals.co.uk/electrical-checklist-buying-a-house-london/#guide-section-8)
[Frequently asked questions](https://intelaelectricals.co.uk/electrical-checklist-buying-a-house-london/#guide-section-9)

**Ask an electrician**
[Request a quote](https://intelaelectricals.co.uk/contact/#request-a-quote)
[07516 617 680](https://intelaelectricals.co.uk/electrical-checklist-buying-a-house-london/+447516617680)

**Related electrical guides**[All eicr and certificates guides →](https://intelaelectricals.co.uk/category/eicr-and-certificates/)