If a kitchen supplier, heating installer or workshop equipment dealer asks whether you have three-phase electricity, ask them for the electrical specification of the exact model. There are two different questions to answer. Does the equipment itself need a three-phase connection? Or can it run on single phase, but add more demand than the house can comfortably support? The first question is about compatibility. The second needs a calculation for the property as a whole.
That distinction can save a renovation from an expensive detour. A three-phase woodworking machine and several ordinary domestic appliances present different design problems, even if their total power figures look similar. Before seeking a network quotation, give an electrician the proposed equipment list and explain when you expect to use each item. Do this before paying a non-refundable deposit on equipment with a particular supply requirement.
What changes when a house has three phases?
On a typical UK single-phase domestic supply, ordinary equipment operates at a nominal 230 volts between line and neutral. With a three-phase supply, an installation has three lines available. The nominal voltage between any two lines is 400 volts. An electrician can distribute ordinary single-phase circuits across those lines and provide a suitable circuit for equipment specifically designed for three phases.
Your existing kettle, fridge and television still need their normal supply. They do not suddenly receive 400 volts because the network connection has changed. The design decision is which circuits and loads belong on each phase, how they will be protected and how the installation will be maintained. The presence of three phases does not mean every appliance can use the total capacity available across the building.
Think of a workshop containing a three-phase machine alongside ordinary lights and sockets. The machine’s installation instructions may specify its required supply, starting characteristics and protective arrangements. A home office with electric heating, on the other hand, may have a perfectly ordinary single-phase requirement. Both projects deserve an electrical assessment, but the word workshop or office on the planning drawing does not determine the answer.

Find out what supply you already have
Start with existing paperwork. A recent electrical installation certificate, inspection report, previous connection quotation or correspondence with the distribution network operator can give the electrician a useful lead. Check that the documents belong to the correct address, especially in a converted property where the shop and upstairs flats share a street number. Give the electrician the meter point details from the bill if requested.
You can also photograph equipment that is already visible without opening electrical covers. Take one wider photograph showing the relationship between the incoming supply, meter and consumer unit, then a readable photograph of accessible labels. Leave seals, fuse carriers and covers in place. A label on a switch or fuse holder can describe the rating of that component without confirming the property’s agreed supply capacity.
In a block of flats, a three-phase intake serving the building does not establish that all three phases reach your flat. The building’s distribution and the individual metering arrangement matter. Ask the managing agent who holds the intake cupboard keys and whether drawings are available. Private distribution equipment between the street supply and your meter can change who needs to be involved in a survey.

Build a useful list of proposed loads
List the electrical input of each significant item. Include electric showers, direct electric heating, cooking equipment, immersion heaters and any new machinery. For a heat pump, distinguish the heat delivered to the building from the electrical input. Ask the installer for the maximum electrical demand of the proposed unit and any auxiliary heater. The heating output printed prominently on the brochure is not enough for the electrical design.
Add the manufacturer’s model reference, supply requirements and usage pattern beside each item. A shower used for ten minutes before breakfast behaves differently from a heater maintaining temperature throughout a cold evening. A machine that starts occasionally may have particular starting requirements even if its normal running current looks modest. Tell the electrician about existing equipment you intend to remove, too. A replacement is not necessarily an additional load.
For a household considering electric vehicle charging, identify the proposed charging power, the hours the vehicle is normally parked and whether a compatible system can adjust demand automatically. Those facts belong in the same assessment as cooking and heating. A high advertised charging rate is of little practical value if the vehicle cannot accept it or the household has ample time to charge more slowly.
Why the largest numbers on the labels are only a starting point
Take a simple example. A 9.2 kW resistive load on a nominal 230 V supply draws approximately 40 A while operating at full power. That figure describes one load. It tells you neither the spare capacity at the address nor what happens when other appliances run. It is also not a method for sizing a circuit or selecting a protective device.
An electricity bill answers a different question. A monthly total in kilowatt-hours measures energy used over time. Two houses can buy the same amount of energy while having very different peak demands. One family might spread cooking, hot water and laundry through the day. Another may bring several large loads on together just as the heating starts in the evening.
If you have half-hourly consumption data, offer it as supporting information. Mention whether the period includes winter weather, visitors, a holiday or equipment that has since been removed. A half-hour average can hide a short peak. The electrician may recommend more detailed monitoring where existing loads are uncertain. Never turn everything on together deliberately to see whether the supply will cope.
Compare the options before asking for excavation
One option may be to retain the existing connection and choose equipment with a compatible rating. For example, a workshop supplier may offer a single-phase version of the machine. Ask whether its performance, warranty and operating requirements meet the intended job. A cheaper connection option is not much help if the substituted machine cannot do the work you bought it for.
Another possibility is professionally designed load management. A controllable load can reduce its demand while essential equipment needs capacity. Ask which appliance is controlled, what happens during a busy evening and how the system behaves if communications fail. A promise to remember not to use two appliances together is a poor substitute for a design that must work for guests, tenants and future owners.
Where extra capacity is needed, a network operator may consider a fuse upgrade on an existing single-phase service or a different connection arrangement. Eligibility depends on the service and installation. UK Power Networks describes the options in its guide to increasing supply capacity. Obtain advice for your address before assuming that the next fuse size is available or that three phases are essential.
Coordinate the network, meter and consumer installation
The distribution network operator looks after the local network connection. The electricity supplier arranges the metering side. Your electrician deals with the customer installation and coordinates what needs to be ready for connection. UK Power Networks sets out the equipment boundaries in its fuse upgrade guidance. In shared buildings, clarify any additional responsibilities with the freeholder or building network operator.
Ask for the network quotation in writing. Read what it includes for excavation, ducts, meter position, access and reinstatement. If the work crosses a shared driveway, establish whose consent is required before confirming a date. A quote for the network connection may leave separate costs for the meter arrangements, consumer equipment, internal cable routes, builders’ work and final decoration.
Agree the appointment order. It is possible for the network work to be complete while the new metering or customer installation still needs attention. Identify who is arranging each attendance and how a change of date will be communicated. Keep the connection reference and site contact details together so that the electrician, supplier and network team are talking about the same job.
A renovation example with two different outcomes
Consider a house adding an induction hob and replacing an old heating system. The kitchen drawing lists a maximum hob rating. The heating brochure gives the heat pump’s heating output. Neither figure tells the whole story. The electrician asks for the hob’s permitted power settings, the heating unit’s electrical data, details of any backup element and the specification of the existing electric shower.
In one version of this project, the shower will be removed and the new equipment fits the assessed single-phase capacity. In another, the shower stays, a workshop machine genuinely requires three phases and the proposed supply arrangement needs network input. The property can be identical in both examples. What changes is the equipment retained, the service the owner wants and how the loads interact.
Use the decision to inform the building sequence. If a change of connection looks likely, avoid laying the final driveway surface before the route is agreed. If the connection stays, ask the electrician to document the assumptions behind that assessment. A future owner adding equipment can then identify which changes warrant a fresh look instead of relying on a vague assurance that the house has plenty of power.
Plan the interruption around the people using the building
An agreed connection date is only useful if the right people can give access. List the rooms, cupboards and external areas the teams may need. In a shop with a flat above, the shop manager might hold the intake key while the resident controls access to the meter or consumer unit. Establish the arrangement before anyone takes time off work.
Ask the project lead what interruption to expect and which parts of the premises may lose power. For a business, consider refrigeration, tills, access controls and equipment that needs an orderly shutdown. For a household, identify anyone relying on powered medical equipment and agree a suitable continuity plan with the relevant provider well before the appointment. Avoid promising occupants a restoration time that the network team has not confirmed.
At handover, ask who has confirmed the supply is available, who has tested the altered customer installation and where the relevant installation records are kept. File the meter information, connection documents and circuit schedules together. Mark any work still outstanding, such as reinstating paving, so the final visit covers the physical site as well as the electrical paperwork.
Frequently asked questions
Will three-phase electricity lower my energy bill?
A connection change by itself does not reduce the energy a particular appliance needs for the same task. Compare the actual tariff, standing charges where applicable, installation costs and equipment performance. If a proposed saving depends on moving consumption to a cheaper time, model that scheduling change separately. Otherwise it is easy to credit the supply upgrade for a saving available on the existing connection.
Can I tell the supply capacity from my smart meter?
A meter label or display may help identify the meter type, but it does not establish every limit on the connection or installation. Give the electrician a safe photograph and the relevant paperwork. If the existing service capacity is unclear, the network operator can be asked to confirm its position. There is no need to disturb a seal to make the enquiry.
Does a new consumer unit give me a larger electricity supply?
Replacing a consumer unit changes customer-side distribution and protection. It does not automatically change the incoming service or network capacity. An upgrade project may need both kinds of work, which is why quotations should identify them separately. Ask what problem the proposed board solves and whether the network operator or meter provider also needs to attend.
What should I send for a three-phase supply assessment?
Include the property address, the planned equipment list, the intended installation dates and any existing network correspondence. Say whether the premises are a house, flat, shop or mixed-use building. For a survey in Enfield, contact Intela Electricals or call 07516 617 680 with the model details and your proposed timetable.